Farquhar Road: Work on Bridge & Road Closure

road-closedThe bridge from Crystal Palace Parade to Farquhar Road is undergoing necessary repairs. As a result, that part of the road could be closed up until 31 March.

We have written to the Council asking it to ensure that refuse collections are not affected since they were interrupted the last time the bridge was closed.

Andrew has also asked that the work be completed as quickly as possible, to minimise disruption.

If you have any questions about his matter, or experience any avoidable difficulties because of the work, do please get in touch with us by email (agibson@lambeth.gov.uk) or telephone (020 7926 2449) and we will do what we can to help.

Leave a Reply

You can use these XHTML tags: <a href="" title=""> <abbr title=""> <acronym title=""> <blockquote cite=""> <code> <em> <strong>